Redfern
Twin tri-level terraces, each same but different, are a charactered presence on a typical inner city lane. Working as project architect with Scott Weston Architecture Design, the subdivision & construction of the terraces provided a thoughtful infill to an abandoned warehouse site. Humble & robust materials such as timber cladding, glazed bricks, concrete, screen blocks & laminate are elevated in a visually layered series of spaces.
Budget: $750k-$1mil
Stage: Completed
Timeframe: 18 months
Builder: Upa Level Constructions
Engineer: Leigh Bachmann
Joinery: All Aspects Joinery